Sample workflow
Walk a sample job from measurement to profit
This uses the same calculation engine as the product, with example rates. Your own styles, material costs, labor rates and overhead replace these once you set up your company.
Step 1 · Site measurements
Total length walked on site, gates included.
Each gate adds one post and hardware.
Removed from the fenced length.
Each corner needs its own post.
Share of the price left after job costs.
Example rates only — not a quote and not a price list.
Step 2 · Takeoff, step by step
Fenced length
130 ft measured − 4 ft of gate openings
126 ft
Sections
126 ft ÷ 8 ft maximum spacing, rounded up
16
Posts
16 sections + 1 end + 1 gate post + 2 corner − 1 shared
19
Rails
3 per section × 16, +5% waste, rounded up
51
Pickets
2.2 per fenced foot × 126 ft, rounded up
278
Concrete bags
2 per post × 19, +5% waste, rounded up
40
Step 3 · Cost and price
- Materials
- $2,090.74
- Installation labor
- $1,224.00
- Labor burden (22%)
- $269.28
- Allocated overhead (10%)
- $358.40
- Contingency (3%)
- $107.52
- Cost basis
- $4,049.94
- Price at 35% target margin
- $6,230.68
- Price per fenced foot
- $49.45
- Same number used as markup (35%)
- $5,467.42
Using 35% as a markup instead of a margin prices the job at $5,467.42 and earns 25.9% margin. Margin here is a job contribution figure on the price before tax — it is not net company profit.
Step 4 · Customer proposal
Sample — simulatedSample Fence Co.
Proposal for: Sample customer
Version 1
Supply and install 126 ft of 6 ft cedar privacy fence with 1 walk gate, including posts set in concrete.
Total before tax
$6,230.68
Your customer sees the scope and price — not your costs or margin.
Step 5 · Crew and materials
Sample — simulatedCrew A · 2 installers · scheduled for 2 days
- Posts × 19Picked
- Rails × 51Picked
- Pickets × 278On purchase order
- Concrete bags × 40Picked
- Gate hardware kits × 1Picked
Quantities come from the takeoff above. Stock statuses are simulated for the demo.
Step 6 · Estimate vs. actual
Sample — simulatedTry 115 to see an overrun.
Recorded hours × your rates.
| Cost | Estimated | Actual | Difference |
|---|---|---|---|
| Materials | $2,090.74 | $2,174.37 | +$83.63 |
| Labor incl. burden | $1,493.28 | $1,433.55 | -$59.73 |
| Gross profit | $2,646.66 | $2,622.76 | -$23.90 |
Gross profit here is price minus materials and labor; it excludes overhead, as in the product.